System of the Month February 2025: full-power BMS testing in one rack

A 120-cell BMS test system integrates temperature simulation, isolation tests, fault insertion and the customer’s control units in one safety cabinet.

System of the Month February 2025: full-power BMS testing in one rack

The configuration

  • 120 simulated cells
  • 24 temperature channels
  • Isolation testing and fault insertion
  • Integrated customer control units

The engineering task

The BMS needs to respond consistently to cell conditions, temperature signals and electrical faults. The customer required a controlled setup that includes the control units and their connections.

The system

The full-power BMS test rack combines 120 cell channels, 24 temperature channels, isolation testing and a Fault Simulation Unit. The customer control units are integrated into the test arrangement.

Why this arrangement matters

Cell, sensor and fault conditions can be reproduced without repeatedly rebuilding the wiring. The cabinet brings the simulated battery and the customer’s electronics into one defined test setup.